INVITATION TO BID TOWN OF BYRON, FOND DU LAC COUNTY
Cold Mix Paver Wedging & Overlay | Hot Oil Seal Coating
1- Millpond Rd. (‘Y’ to ‘F’) Total Length (1.50 mi.) X 21ft.
- Apply a single hot oil chip seal coat application using F2 1/8” granite black stone chips
2- Kelly Rd. (F’ to East Fondy Rd. joint) 11,525ft. (2.18 miles) X 21ft.
- Apply a single hot oil chip seal coat application using F2 1/8” granite black stone chips
3- Hickory Rd. (‘Y’ to ‘F’) * 7,950ft. (1.50 miles) X 21-22ft.
- Apply a single hot oil chip seal coat application using F2 1/8” granite black stone chips
4- Oaklane Rd. (‘Y’ to County Line) * 2,680ft. (.50 miles) X 21-22ft.
- Apply a single hot oil chip seal coat application using F2 1/8” granite black stone chips
5- Kenyon Rd. (‘D’ to River Rd.) * 8,130ft. (1.55 miles) X 21-22ft.
- Apply a single hot oil chip seal coat application using F2 1/8” granite black stone chips *Needs crack fill prior to seal coat
6- Church Rd. (Hickory Rd. to Hwy. 175) * 750ft. X 30ft., 7,250ft. X 21ft. (1.52 miles) X 21-
30ft.
- Apply a single hot oil chip seal coat application using F2 1/8” granite black stone chips
7- Lost Arrow Rd. (Hickory Rd. to KellyRd.)
- Potential seal coat projects tying all cold mix wedges together with existing surface.
Bids will be accepted until 7:00 p.m. on Tuesday, April 8, 2025, at the Town of Byron Town Hall.
For further information, contact Dustin Westphal at W6209 West Byron Road, Brownsville, WI 53006 Phone 920-960-8186
Mary Laudolff
Town of Byron Clerk
Class 2 Notice, March 25 & April 1, 2025